Industrial Projects

Sealtech Restorations has completed many industrial type jobs. We’ve maintained a talented but relatively small staff, which allows us to be flexible for our customers. It is not uncommon for our project supervisors to receive an urgent call on Saturday, mobilize on Sunday, and be working a large job in Lethbridge, AB.

Asbestos abatement is a specialty trade, and hiring experienced professionals is the best way to get your job in on-time and without problems. Sealtech has been abating industrial-size projects for over 30 years. We save our customers (usually dismantling and demolition companies) time and money by using time-tested and proven methods for remediation.

As asbestos related employee health issues become more prevalent, Sealtech Restorations offers these clients a complete range of asbestos removal services that can alleviate current and future health hazards for all employees. For industrial clients dealing with asbestos issues, we seek to minimize the inconveniences associated with clean-up by identifying and isolating asbestos-containing structural areas including:

  • Boilers
  • Pipe Insulation
  • Siding
  • Duct Wrap
  • Wire Wrap
  • Water Heaters
  • Flooring Materials (i.e. tile, linoleum and others)
  • Roofing
  • Spray-on Fireproofing
  • Others

Our staff works with each industrial client to ensure that the area to be remediated is fully isolated from other areas and will not generate employee health concerns. Sealtech Restorations is very flexible and will complete the project even during your operation time or after working hours without affecting your business.

COMPLETED INDUSTRIAL PROJECTS:

1. TENARIS – PRUDENTIAL STEEL (May – Aug 2011)

Sealtech Restorations Ltd was the winner of the tender for the asbestos abatement in Mill#1 at Tenaris Prudential Steel. It was by all accounts the largest spray applied asbestos removal project in Calgary and most likely in all of Alberta for 2011.  The necessary coordination from all sides meant constant communication to ensure maximum efficiency during the removal process. As the project had to revolve around an operational steel mill with ever changing shifts (with several weeks at 24-hour operation), Sealtech Restorations Ltd had to provide and ensure availability of professional staff at any time of the day or night.

Over all, this Calgary project was the biggest asbestos removal undertaken for Tenaris in Canada.  It had the potential for the largest disruption to their employees and its operation; however, the dedication, cooperation and overall effort of the abatement contractor Sealtech allowed this project to be an overwhelming success.

FACTS:

  • During 4 months of the Tenaris project, Sealtech Restorations Ltd removed approximately 18,000 square feet of insulation materials from walls;
  • The project was completed with zero safety incidents, within budget, and on time.